GET A QUOTE

Dry Kiln for Sale | Oak Plank Drying Project

Core Information

4 drying rooms with dimensions of 6.5×6×4.6m (equipped with 10cm insulation boards), matched with 8 sets of 12HP integrated heat pumps and heat recovery systems. It takes only 48 hours to dry 6cm-thick oak planks, with the moisture content accurately controlled at 8-10% and no cracking or deformation.

Process Key Points

Preheating at 40-50℃ (without moisture removal) → Moisture removal when temperature rises above 55℃ → Heat preservation at 60-70℃ for 4-8 hours → Slow cooling before kiln discharge. The heat recovery system reduces energy consumption by approximately 18%.

Energy Saving & Cost Efficiency

Compared with electric heating, energy consumption is reduced by 62%.

Share your love

Leave a Reply

Your email address will not be published. Required fields are marked *